2025-12-01 | Increased forecast simulation asset limits

Changed

Forecast simulation asset constraints

Maximum values increased for battery energy storage system (BESS) parameters in forecast simulations.

GET /forecasts/forecasts/

Modified response fields:

  • results[].run_asset.duration (number) - Maximum increased from 8 to 12 hours
  • results[].run_asset.rated_power (number) - Maximum increased from 500 to 1000 MW

POST /forecasts/run-simulation/

Modified request fields:

  • run_asset.duration (number) - Maximum increased from 8 to 12 hours
  • run_asset.rated_power (number) - Maximum increased from 500 to 1000 MW

Modified response fields:

  • run_asset.duration (number) - Maximum increased from 8 to 12 hours
  • run_asset.rated_power (number) - Maximum increased from 500 to 1000 MW